Day 194 - Walk Through

Progress:
 Went to the walk through today which took about an hour and it was sooo cold!  I didn't think it was going to be that cold otherwise I would have worn heavier gloves.  It was still really nice to finally see the inside of the house, I can't wait for the next walk through.  Tyler wasn't able to make it to this appointment so I'm going to try to work something out with Brett so he won't have to wait until after the cabinets are done.

So the next step is for the insulation and drywall which will take about two weeks for it all to be done.  We still have a tentative date for May 15, 2012 as our move in date.

Basement:

Looking towards guest room/bathroom/under stairs storage


Storage room (left), laundry room (right)

Looking at storage room

That thing hanging down in the back of the picture is the HRV unit.  It circulates the air in the whole house to help make any moisture in the house evaporate so it doesn't turn into mold.

Hot water tank, water lines

Inside guest bedroom looking at closet/bathroom

Looking through guest bedroom wall


Main Floor:

Looking to back of main floor

pantry/stove(left), bathroom(behind left), back door (back - right)

Backyard

Looking into the bathroom

Looking toward front of house

Second Floor:

Looking towards Master Bedroom from hallway

Master bedroom window

Bathroom (left), walk in closet (right)

closet window

Jetted tub


Stairs window

Linen closet

main bathroom

Future Library/Loft

Tyler's office

Office closet

Third Floor:

Art room/Balcony

View

Looking out from art room

Down the stairs

Loft

Looking towards art room


Down to the main floor