Progress:
So the kitchen seems to be completely done and the carpet is still needing to be installed but that will probably be one of the last things they do so it doesn't get dirty.
One thing I just noticed is our door handles. I know they will be painting our door the last week of construction but I wonder if they will change the door handles at the same time since maybe they wouldn't want to get the handles dirty?
I'm really happy with how the kitchen is looking especially the lino that we picked out, I love the pattern of it!!
Another thing I am curious about is why the brown "topper" (brown piece of wood in the right hand of the picture) is not covered. When we went through the walk through all of these pieces were covered and they had three areas that needed to be stained. They have stained all of them and I could see that the other two were covered but this one is not. This doesn't make sense to me as I could see that it was dirty and there was a white film over it. Doesn't really make sense because the brown can easily be damaged (especially because it is right near the door where every person come through...high traffic area).
The siding has been completed finally (it was on hold for a couple days because the house beside us was trenching...it hasn't taken them long to build it).
What I am really curious about is why the Daytona house on the left hand side has an extension cord running from our house on the right hand side. I assume that little paper with the big red fail symbol on it means that they failed their inspection that had to do with electricity (or pilings who knows). I wonder if Jayman gave them permission or if they just walked in and connected because I know the door is open often because there have been trades going in and out most days. Might have to ask about this.